Skip to content
Ultimate Roofcare Ltd
Call us
01234 634 016
Quote
Ultimate Roofcare Ltd
Call us
01234 634 016 Get a quote

Our work

Project High Wycombe: a true showstopper

Over 14,000 Marley Acme clay plain tiles in Heather Blend, extensive traditional leadwork and a complete roof transformation in High Wycombe, Buckinghamshire.

  • High Wycombe
Project High Wycombe: a true showstopper

What we did

How the job went

Some projects really do stand out, and our recent roof transformation in High Wycombe, Buckinghamshire, is without doubt one of the finest projects we have completed at Ultimate Roofcare Ltd.

From the beautiful traditional clay tiles and extensive bespoke leadwork to the sheer scale of the renovation, this was a project that required exceptional craftsmanship, careful planning and a tremendous amount of teamwork.

At a glance

  • Over 14,000 Marley Acme Single Camber clay plain tiles in Heather Blend
  • A new Code 5 lead box gutter, with new lead round the chimneys and front bay windows
  • New hanging tiles and a fleece-backed EPDM flat roof on new 18mm plywood
  • New black uPVC soffits, fascias, guttering and downpipes
  • Six of our team on site for three weeks
A walk round the job, from the ground and from the drone.

With over 14,000 individual roof tiles, new hanging tiles, extensive leadwork, a complete flat roof replacement and an entirely new roofline, this stunning property has undergone a remarkable transformation.

But what makes this project particularly special to us is not just the finished result. It’s the journey we shared with the homeowners, from our very first appointment through to the final handover.

The Customer Journey – Building Trust From the First Appointment

We were delighted to be invited to provide a quotation for this substantial roof replacement alongside several other roofing companies. We were the third company to come out and look at it.

Understandably, with a project of this size and importance, the homeowners wanted to be absolutely confident they were choosing the right company to undertake the work.

From our very first appointment, we took the time to understand exactly what the customers wanted to achieve, discussing the condition of the existing roof, the work required and the different options available.

Following our initial survey, we provided a comprehensive written quotation clearly outlining the proposed works, materials, installation process and what would be included within the agreed price.

We believe that transparency is incredibly important when undertaking a major home improvement project. Our customers should know exactly what they are paying for, what work will be carried out and how their property will be looked after throughout the process.

The house before we started, with its original roof.
The house before we started, with its original roof.

Rather than simply sending a quotation and leaving the homeowners to make their decision, we arranged a second appointment to sit down together and discuss the different roofing materials and finishes available.

Choosing the right roof tile was particularly important on this property.

The homeowners wanted to maintain the traditional character of their home and ensure the new roof complemented the surrounding properties. They were keen to avoid anything too bright or modern-looking that might detract from the original appearance of the house.

After looking through different samples and discussing the available options, the homeowners selected Marley Acme Single Camber clay plain tiles in Heather Blend.

This was a fantastic choice. The beautiful combination of warm reddish tones with darker shades running through the tiles gives the roof a rich, natural appearance, perfectly suited to the property’s character and the surrounding street.

The customers also took the time to visit some of our previously completed roofing projects in the local area, including one just round the corner finished in a very similar tile, allowing them to see the standard of our workmanship firsthand.

For us, there is no better way to demonstrate the quality of our work than by allowing prospective customers to see the finished results for themselves.

After reviewing the quotations, attending our meetings and visiting examples of our previous work, the homeowners decided to place their trust in Ultimate Roofcare.

Receiving the news that we had been selected for this project was a genuinely proud moment for our company.

We understood the responsibility that came with undertaking such a substantial renovation, and we were determined to deliver a result that justified the confidence the homeowners had placed in us.

Planning and Preparation – Before a Single Tile Was Removed

Once the contract had been agreed, our attention turned to the detailed planning required to undertake a project of this scale.

At Ultimate Roofcare, we believe that a successful roof replacement begins long before the first tile is removed.

We arranged a further meeting with the homeowners to discuss the complete programme of works, site access, scaffolding arrangements, material deliveries, waste management and the day-to-day running of the project.

Every aspect needed to be carefully considered to ensure the work could progress safely, efficiently and with as little disruption to the homeowners as reasonably possible.

A dedicated site toilet was arranged, waste skips were organised and the delivery of materials was carefully coordinated around the roofing programme.

One particularly important consideration was an overhead electrical cable close to the property.

Before scaffolding was erected or any roofing work commenced, we arranged for UK Power Networks to attend and install protective wrapping around the cable, ensuring the appropriate safety precautions were in place.

These are the types of details that may never be noticed when looking at the finished photographs, but they demonstrate the level of preparation involved in managing a major roofing project professionally.

We also planned the involvement of the relevant local Building Control authority, arranging for the necessary inspections to take place at appropriate stages throughout the roofing works.

This meant that Building Control requirements were considered from the outset rather than being left until the project was completed.

With the preparations in place, the scaffolding erected and the materials organised, our experienced roofing team was ready to begin. The scaffold went up on a Saturday and we started on the Monday, with six of our team on the roof for three weeks.

Dedicated Site Management and Daily Quality Checks

Throughout the project, the works were overseen by a dedicated site manager responsible for coordinating the roofing team, monitoring progress and maintaining our standards on site.

We understand that having a large team of roofers working on your home can be a significant undertaking for any homeowner.

That is why we place such importance on clear communication, organisation and ensuring our customers know who is responsible for managing their project.

Our site manager remained involved throughout the works, overseeing the different stages of the installation and keeping the project moving in a structured and organised manner.

Daily site checklists were completed at the end of each working day, helping us monitor progress, housekeeping, site security and the condition of the working areas.

With so many different elements involved, including clay tiling, traditional leadwork, hanging tiles, flat roofing and roofline replacement, careful coordination was essential.

Our team also had to work around the unpredictable British weather, ensuring exposed roof sections were managed appropriately as the work progressed.

For us, professional site management is about much more than completing the work on time. It is about respecting the customer’s property, maintaining high standards throughout and ensuring that every stage receives the attention it deserves.

Over 14,000 Marley Acme Clay Roof Tiles

The main roof underwent a complete replacement, with the existing roof coverings removed to allow the new roofing system to be installed.

New breathable roofing membrane and pressure-treated roofing battens were fitted before the installation of the beautiful Marley Acme Single Camber clay plain tiles in Heather Blend.

Over 14,000 individual clay roof tiles were installed on this property alone.

Marley Acme Single Camber clay plain tiles in Heather Blend, with a dry ridge along the hips.
Marley Acme Single Camber clay plain tiles in Heather Blend, with a dry ridge along the hips.

The sheer quantity of tiles involved gives an indication of the scale of this project.

Unlike larger-format roof tiles, traditional clay plain tiles require a considerably greater number of individual tiles to cover the roof area, making the installation a particularly labour-intensive process.

Every section required careful setting out, accurate alignment and consistent tile courses to achieve the beautiful, uniform finish visible in the completed photographs.

The Heather Blend colour was particularly well suited to this property. The mixture of traditional reddish tones and darker natural shading creates a timeless appearance, retaining the character of the home without making the new roof look overly bright.

The roof was completed with new traditional valley tiles, a modern dry ridge system and traditional cement verges.

These details were carefully finished to complement the property’s architecture while providing a professionally installed roofing system.

Extensive Traditional Leadwork – A Standout Feature

One of the most impressive aspects of Project High Wycombe was the amount of traditional leadwork required throughout the property.

This was far more than a straightforward roof replacement.

Our skilled team installed a completely new Code 5 lead box gutter, together with extensive new leadwork around the chimneys and front bay windows.

The box gutter was a particularly important part of the renovation, requiring careful preparation, installation and detailing to manage rainwater effectively between the adjoining roof sections.

The chimneys received new lead flashings, carefully dressed and finished to complement the surrounding clay tiles.

At the front of the property, the bay windows were completed with beautiful new traditional leadwork, creating an elegant finish that enhances the character of the home.

New lead round the front bay, between the two gables.
New lead round the front bay, between the two gables.

The amount of leadwork involved was considerable, and it is one of the elements of this project that we are especially proud of.

Traditional leadwork requires experience, patience and attention to detail. When completed correctly, it provides both essential weather protection and a beautiful architectural finish.

The combination of the new leadwork and the Heather Blend clay tiles is one of the standout features of the entire transformation.

Complete Hanging Tile Replacement

Alongside the main roof, the property also received all-new hanging tiles.

These were an important architectural feature of the house, and renewing them as part of the wider project allowed us to achieve a consistent appearance across the entire property.

Careful attention was given to the setting out, alignment and finishing of the hanging tiles, ensuring they complemented the new main roof covering.

This was another substantial part of the renovation and contributed significantly to the finished appearance of the home.

Brand-New Fleece-Backed EPDM Flat Roof

The project also included a complete replacement of the property’s flat roofing.

The existing flat roof covering was removed, and new 18mm plywood decking was installed to provide a fresh, solid foundation.

A high-quality fleece-backed EPDM rubber roofing membrane was then fitted, providing a durable and flexible waterproofing system.

The renewed flat roof at the back, with its rooflight.
The renewed flat roof at the back, with its rooflight.

This allowed the flat roof to be renewed as part of the overall roofing renovation, ensuring that both the pitched and flat roofing areas received the same level of care and attention.

New Black uPVC Soffits, Fascias and Guttering

To complete the external transformation, we installed all-new black uPVC soffits, fascias, guttering and downpipes.

The new roofline provides a smart, low-maintenance finish and complements the traditional Heather Blend clay tiles beautifully.

The black bargeboards and guttering against the new clay tiles.
The black bargeboards and guttering against the new clay tiles.

The contrast between the warm clay tiles, traditional leadwork and black roofline gives the property a striking appearance while maintaining its original character.

Internally, our team also boarded out the loft and laid new Rockwool insulation, adding another practical improvement as part of the wider renovation.

Building Control Inspections and Professional Sign-Off

For a roofing project of this size, ensuring the work meets the relevant Building Regulations is an important part of the process.

Building Control involvement was planned before work commenced, with the relevant local authority invited to inspect the roofing works at the appropriate stages of the project.

This provided independent oversight of the applicable building regulation requirements throughout the renovation.

Following completion, the relevant roofing works received Building Control sign-off.

We believe this is an important reassurance for homeowners, particularly when making a substantial investment in their property.

Our commitment is not simply to provide a beautiful finished roof, but to ensure the work is properly managed, documented and completed to the required standards.

Completion, Photographic Evidence and Our 25-Year Guarantee

At Ultimate Roofcare, we believe the customer experience should be just as professional at the end of a project as it is at the beginning.

Once the roofing works were completed, the property underwent its final checks and finishing inspections before handover.

As part of our completion process, we provide customers with a photographic record of the works, helping them see the different stages of their roof replacement, including areas that are no longer visible once the new roof has been installed.

This is particularly valuable on a project of this scale, where so much important work takes place beneath the finished roof covering.

The homeowners are also provided with our completion documentation, confirming the works undertaken and providing a clear record of the finished project.

Our full roof replacements are supported by a 25-year transferable workmanship guarantee, providing long-term reassurance and added peace of mind.

We believe that once a customer has invested in a new roof, they should have the confidence of knowing exactly what has been completed, with the relevant documentation and guarantee to support the work.

Our aim is always to leave our customers with more than simply a new roof. We want them to feel confident in the company they have chosen and proud of the improvements made to their home.

The Finished Result – A True Showstopper

Looking at the completed photographs and drone footage, the scale of this transformation really does speak for itself.

The finished house from the drone, with our vans on the drive.
The finished house from the drone, with our vans on the drive.

Over 14,000 beautiful Marley Acme clay roof tiles, extensive traditional leadwork, carefully finished valleys, new hanging tiles, a completely renewed flat roof and an immaculate black roofline have all come together to create something truly special.

But what makes Project High Wycombe particularly rewarding for us is the entire journey.

From our first meeting with the homeowners and providing a detailed written quotation, to returning with tile samples, helping them choose the perfect finish and arranging visits to our previous projects, every stage was approached with care.

Being chosen over other roofing companies was a privilege, and we understood the trust that had been placed in us.

The extensive preparation, involvement of UK Power Networks, organised site facilities, dedicated site management, daily checklists, planned Building Control inspections and final photographic handover all formed part of delivering this project professionally from beginning to end.

A tremendous amount of hard work went into this property, and we would like to give particular credit to our site manager and the entire roofing team for their dedication, organisation and exceptional workmanship throughout.

We would also like to sincerely thank the homeowners for placing their trust in Ultimate Roofcare and giving us the opportunity to undertake such an impressive renovation.

One of the most rewarding parts of completing Project High Wycombe is that we can now proudly showcase this property to future customers, just as these homeowners visited our previous projects before choosing us.

For a family-run roofing company, there is no greater satisfaction than seeing our workmanship speak for itself and knowing that the trust placed in us has resulted in a finished project we can all be proud of.

Project High Wycombe represents everything we strive to deliver at Ultimate Roofcare Ltd: careful planning, honest communication, professional site management, traditional craftsmanship and an uncompromising commitment to quality.

Without doubt, this is one of the finest roof transformations we have completed to date. A true showstopper, and a project that will remain a proud part of the Ultimate Roofcare portfolio for many years to come.

In progress

Every stage of the job

In the order the work happened. Every photograph is Ultimate Roofcare's own, taken on site. Click any of them to see it full size.

Federation of Master Builders · Free written quotes · Insured up to £2 million · Rated 4.9 on Google

Arrange a visit and a free written quote

Call 01234 634 016, or send the form and we will call you back.

Call now Get a quote